Load forecasts form the basis for development of strategic system plans. Accurate load forecasting is critical since the future load characteristics determine the location, size, and timing of future facilities.
ABB is unique in the power industry in its capability to perform load forecasts using small-area land-use based simulation techniques. A key aspect of spatial load forecasting is the tie between land use/development and electrical load.
This tie is achieved by assigning each small area of development to the substation serving the area. This tie allows the forecast to be calibrated to actual load levels as well as “rollup” of load growth to components of the electrical system.